Sump pump
A sump is an area or space where liquids are allowed or encouraged to accumulate. Sump pumping is the process of evacuating that liquid using pumps.
In ground engineering works – such as foundations, deep basements, trenches, tunnels and other excavations – groundwater is very often present. This must be dealt with so that work on the site is not difficult, dangerous or even impossible. Modern geotechnical techniques allow groundwater to be safely managed by a process of dewatering.
Without suitable control measures, inflows of groundwater can flood excavations or tunnels, and can also lead to instability when the soils or rock around the excavation weaken and collapse – either locally or on a large scale. The objective of dewatering is to lower groundwater levels to below working level in the excavation. Examples of this group of techniques include sump pumping, well points, deep wells and ejector wells.
Sump pumping is one of the simplest dewatering techniques: groundwater seeps into the excavation and is allowed to collect in sumps – which can either be the lowest point of the excavation or may be an area specially created into which water may seep naturally e.g a well or sump. Each sump will typically have one or more robust electric-powered pumps with the capacity to handle the solids that will inevitably be present. The collected liquid is then pumped away for disposal, either with pumps running continuously or activated automatically as the water level rises.
Sump pumping can be a very effective and economic method to modestly reduce the liquid (‘drawdown’) in a sump, especially in favourable ground conditions such as well-graded course soils (e.g sandy/coarse gravels and gravelly sands).
In unfavourable ground conditions, such as in silts, fine sands and other fine-grained soils, sump pumping may lead to instability as it may draw out fine particles from the soil, potentially causing ground movement such as settlement. Furthermore, depending on the soil type, sump pumping may see high levels of sediment in the pumped water which could have an adverse environmental effect at the point of disposal.
Over the past few decades, there have been several high-profile projects around the world that have been seriously delayed by groundwater problems. However, a greater number have successfully dealt with groundwater.
In the south of England, projects such as High Speed 1 (known as the Channel Tunnel Rail Link during its construction in the early 2000s) and Crossrail have routes which successfully passed through multiple water-bearing strata, including crossing beneath the River Thames. Both projects involved successful dewatering and the use of sump pumps.
[edit] Related articles on Designing Buildings
Featured articles and news
Reporting on Payment Practices and Performance Regulations
Approved amendment coming into effect 1 March 2025.
A new CIOB TIS on discharging CDM 2015 duties
Practical steps that can be undertaken in the Management of Contractors to discharge the relevant CDM 2015 duties.
Planning for homes by transport hubs
Next steps for infrastructure following the updated NPPF.
Access, history and Ty unnos.
The world’s first publicly funded civic park.
Exploring permitted development rights for change of use
Discussing lesser known classes M, N, P, PA and L.
CIOB Art of Building 2024 judges choice winner
Once Upon a Pass by Liam Man.
CIOB Art of Building 2024 public choice winner
Fresco School by Roman Robroek.
HE expands finance alliance to boost SME house building
Project follows on from Habiko public-private place making pension partnership for affordable housing delivery.
Licensing construction; looking back to look forward
Voluntary to required contractors (licensing) schemes.
A contractor discusses the Building Safety Act
A brief to the point look at changes that have occurred.
How orchards can influence planning and development.
CIOB Construction Manager of the Year award
Shortlist set to go head-to-head for prestigious industry title.
HSE simplified advice for installers of stone worktops
After company fined for repeatedly failing to protect workers.
Co-located with 10th year of UK Construction Week.
Time for knapping, no time for napping
Decorative split stone square patterns in facades.
A practical guide to the use of flint in design and architecture.